HEIP Factsheet

Location Hermosa, Bataan
Barangay Bacung
Barangay Culis
Barangay Palihan
Barangay Pandatung
Accessible through Subic-Clark-Tarlac Expressway (SCTEX)
Area
Total Area 162 hectares
Saleable Area 124 hectares
Common Area 38 hectares
Sold Area 18.9 hectares
Remaining Area for Sale 105.1 hectares
Infrastructure
Power Service Power is supplied by Peninsula Electric Cooperative (PENELCO) via 10MVA substation and is distributed at 13.2KV stepped down to 460/230V at the customer service entrance.
Communication System Fiber Optic Cable Technology for Voice, Fax, Data, Video Conferencing and Internet Service capabilities is provided by Digitel and Philippine Long Distance Telephone Co. (PLDT).
Water Supply Water is supplied by deepwells and water recycling facility through a dual piping system with a total capacity of 18,000 cubic meters per day.
Road Network The estate’s access road is connected to the spur road linked to the Dinalupihan Interchange. Within the Estate will be a network of 22-meter right-of-way main roads and 15-meter right-of-way service roads with appropriate pedestrian lanes and planting strips.
Centralized Waste Water Treatment Plant The Centralized Waste Water Treatment Facility with a capacity of 12,000 cubic meters per day processes effluents with up to 1,000 ppm Biochemical Oxygen Demand (“BOD”).
Accessibility
Seaport
  • Subic Seaport – 20 kms.
  • Manila South Harbor – 96 kms.
Airport
  • Ninoy Aquino International Airport- 99 kms.
  • Diosdado Macapagal International Airport (Clark) – 35 kms.

Contact Us

Why choose Science Park of the Philippines?

SPPI was established in 1989, and through the years, has gained the reputation of being a cutting edge developer of industrial estates through its Light Industry & Science Park projects.

Today, SPPI is highly regarded as one of the pioneers and leaders in private industrial estate development in the country and has the largest hectarage of industrial estates developed, and being developed with almost 800 hectares of aggregate area.